NARUWASCO
Quality Water, Quality Life

Production Sources, Storage Tanks and Distributions

No Scheme Component Parameters and/Status
1. Eastern water supply scheme Source:

1.  Turasha intake

River abstraction (River Turasha)
1.      Sample for Reference Turasha Treatment Work Design capacity of treatment works is 1900m3/day.

Current production is 1,300m3 per day, Demand – over 19000 m3/day.

Treatment type;

Turasha treatment plant

Full treatment
Pumping

Pump No. 1

Pump no. 2

2 No. pumping units. Duty and stand by pumps

Pump 1: 100m3/hour and operational

Pump 2: 100 m3/ hour and not operational.

Pakawa borehole Yield Pakawa borehole: 240m3/day and operational.
Karunga borehole Yield Karunga borehole:  720 m3/day and operational
NAWASSCO production _ (Malewa source) Design capacity 2000m3/day

Current production 2000m3/day but very erratic

Treatment type: NAWASSCO Malewa source Full convectional treatment plant
Western water supply scheme Source: Nguso springs Spring abstraction
Treatment type Design capacity: 5000m3/day

Treatment type: Half treatment (Chlorination only)

Pumping: No pumping Conveyance type: Full gravity conveyance
Kandutura borehole Kandutura borehole yield: 720m3/day and operational
Southern water supply scheme Source: Nguso spring Spring water abstraction
Treatment type Design capacity: 5000m3/day

Treatment type: Half treatment (Chlorination only)

Pumping: Two stage pumping (Booster pumps) 2 stage pumping (Booster pumps)

Pump 1: Nguso pumps- 100m3/hour and operational

Pump 2: Kibunja pumps- 100m3/hour and operational

Twin borehole 1 Yield Twin borehole 1: 120m3/day and non-operational.
Twin borehole 2 Yield Twin borehole 2: 96m3/day and operational.
ADB Borehole-Molo Yield-720m3/day. Operational
Marishoni borehole Yield – 720m3/day. Operational
Office borehole Elburgon Yield – 360m3/day. Operational
ADB Borehole- Elburgon Yield 720m3/day. Non-operational
High level tank borehole – Molo Yield 120m3/day. Operational
Mau summit borehole Yield 720m3/day. Operational
Total A Borehole-Solar powered Yield 72m3/day. Operational
Total B borehole- Market Yield 72m3/day. Operational
Silibwet spring Yield 720m3/day. Operational
Rongai south treatment works Abstraction: river abstraction. Design capacity 2000m3/day. Capacity to Southern scheme 800m3/day Treatment type: full convectional treatment plant.
Pumping: back washing pump Gravity fed system.
Central water supply scheme Golf borehole Yield 120m3/day. Operational
Shell isolated borehole Yield 120m3/day. Operational
Kerma borehole Yield 72m3/day. Operational
Manjangwa borehole Yield 384m3/day. Operational with dry running challenges
Kerma ADB borehole Non-operational
Rumwe borehole Yield 192m3/day. Operational
Njuguine borehole Yield 240m3/day. Operational but frequently dry runs during dry seasons
Nguriga borehole Yield 240m3/day. Operational but frequently dry runs during dry seasons
Kiamunyi borehole Yield 792m3/day. Operational
Gichobo borehole Yield 240m3/day. Operational
Rongai south treatment works Abstraction: river abstraction. Design capacity 2000m3/day. Capacity to central scheme 1200m3/day Treatment type: full convectional treatment plant.
Pumping: back washing pump Gravity fed system.
Northern water supply scheme Subukia spring Yield 2000m3/day. operational
Ndungiri NAWASSCO water Imported water from boreholes. Supplied on rationing.
Bahati Chania Raw water whose yield is unknown. Shared abstraction point. Share with community practising irrigation.
Crater stream Raw water whose yield is unknown. Shared abstraction point. Share with community practising irrigation.
Kabatini west acre Raw water whose yield is unknown. Shared abstraction point. Share with community practising irrigation.
Storage Tanks.
Eastern scheme High level tank Reinforced concrete tank. Capacity 2000 m3 in Gilgil Langalanga area.  Operational.
West comm (Kenyatta barracks) tank Reinforced concrete tank. Capacity 1000 m3. Operational in Gilgil area
Central tank Reinforced concrete tank. Capacity 3000 m3. Operational in Gilgil town.
ASTU reservoir Reinforced concrete tank with a capacity of 1000m3. Non-operational due to scarcity of water in the area. The tank is in syndicate, Gilgil area.
Clear water tank Reinforced concrete tank with a capacity of 750m3. The tank is operational and located within the treatment works in Turasha, Langalanga area.
Karunga tank Ground masonry tank located in Karunga area. The tank has a capacity of 200m3 and is operational.
Northern scheme Subukia tank Ground masonry tank with a capacity of 30m3. The tank is in Subukia town and is operational.
Bahati tank Ground masonry tank with a capacity of 30m3. The tank is in Bahati town and is operational.
Southern scheme Molo high level tank Reinforced concrete

Capacity 500m3

Location Molo

Operational

Molo high level tank Reinforced concrete

Capacity 400m3

Location Molo

Operational

Molo high level tank Reinforced concrete

Capacity 150m3

Location Molo

Operational

Kibunja tank Reinforced concrete

Capacity 150m3

Location Kibunja

Operational

Chesoen tank Reinforced concrete

Capacity 100m3

Location Chesoen, Molo

Non-operational

Mutirithia tank Reinforced concrete

Capacity 100m3

Location Molo

Operational

Molo office tank Reinforced concrete

Capacity 100m3

Location Molo

Operational with leakages

Molo office tank Reinforced concrete

Capacity 100m3

Location Molo

Operational

Elburgon high level tank Reinforced concrete

Capacity 3000m3

Location Elburgon

Operational

Chebonde tank Gound masonry tank

Capacity 150m3

Location Chebonde, Elburgon

Operational

Elburgon tank Reinforced concrete

Capacity 150m3

Location Elburgon

Operational

Nguso masonry sump Ground Masonry tank

Capacity 150m3

Location Nguso

Operational with leakages

Nguso backwashing tank Ground masonry tank

Capacity 10m3

Location is in Nguso

Operational

Rongai south treatment back washing tank Reinforced concrete tank

Capacity 150 m3

Location Oinoptich

Operational.

Mau summit tank Elevated steel tank

Capacity 90m3

Location Mau Summit

Operational

Ketigoi Church tank Ground masonry tank

Capacity 225m3

Location total, next to Ketigoi church

operational

Rongai south Clear water tank Ground masonry tank

Capacity 100m3

Location Onoiptich

operational

Silibwet spring sump Ground masonry tank

Capacity 50m3

Location Total area

operational

Rising Mains 2.5KM 200mm dia. PVC class E to X

1.8KM 220mm dia. GI pipe to Y

Western water scheme C15 tank Reinforced concrete tank

Capacity 250m3

Location Salgaa

operational

C25 Reinforced concrete tank

Capacity 250m3

Location Kampi ya moto

operational

E7 Reinforced concrete tank

Capacity 315m3

Location Sobea

operational

A25 Reinforced concrete tank

Capacity 315m3

Location Burgei

operational

Berbur tank Elevated steel tank

Capacity 24m3

Location Berbur

operational

Kandutura tank Reinforced concrete tank

Capacity 250m3

Location Kampi ya moto

operational

Central water supply scheme Njoro office tank Reinforced concrete tank

Capacity 250m3

Location Njoro

operational

Njoro office steel tank Steel elevated tank

Capacity 600m3

Location Njoro

Operational but require maintenance

Njoro office steel tank Steel elevated tank

Capacity 40m3

Location Njoro

Operational but require maintenance

Njoro water treatment plant Reinforced concrete tank

Capacity 250m3

Location Njoro, Ngongogeri

operational

Njoro water treatment plant Steel elevated tank

Capacity 60m3

Location Njoro, Ngongogeri

operational

Manjangwa elevated tank Steel elevated tank

Capacity 60m3

Location Njoro, Manjangwa

operational

Maili tatu tank Reinforced concrete tank

Capacity 315m3

Location Njoro, Maili tatu

operational

Rumwe tank Ground masonry tank

Capacity 50m3

Location Rumwe, Piave

Operational

Roret tank (Booster pump station) Ground masonry tank

Capacity 50m3

Location Roret town

Operational

Tulwet tank Ground masonry tank

Capacity 100m3

Location Tulwet

Operational

AIC Kapkatet tank Ground masonry tank

Capacity 100m3

Location Kapkatet

Operational

Njuguini tank Ground masonry tank

Capacity 100m3

Location Njuguini

Operational

Njuguini tank Ground masonry tank

Capacity 225m3

Location Njuguini

Operational

Masonic tank Reinforced concrete tank

Capacity 2x1000m3

Location kiamunyi, Kwa Musoni

Non-operational

Mercy Njeri tank Reinforced concrete tank

Capacity 250m3

Location kiamunyi, Makiki

Non-operational

Police line tank Naishi Ground masonry tank

Capacity 100m3

Location Njuguini, Naishi

Operational

Nguriga tank Ground masonry tank

Capacity 100m3

Location Naishi, Nguriga

Operational

Pwani tank Ground masonry tank

Capacity 100m3

Location Pwani

Operational

Ndemi tank Ground masonry tank

Capacity 100m3

Location Ndemi

Operational

Menengai booster tank Reinforced concrete tank

Capacity 150m3

Location Kiamunyi, Menengai

Non-operational

Eastern supply scheme Distribution and transmission Mains Ductile iron, DN 300 mm Length 5,153.3 Meter

Galvanized iron, DN 63 mm length 16.7 meters

Galvanized iron, DN 600 mm length 10,156.3 meters

Galvanized iron, DN 150 mm length 3,547.1 meters

Galvanized iron, DN 110 mm length 3,464.6 meters

HDPE, DN 50 mm length 8,810.5 meters

HDPE, DN 90 mm length 103,570.4 meters

HDPE, DN 63 mm length 8,285.5 meters

Upvc, DN 50 mm length 224,395.5 meters

Upvc, DN 32 mm length 115,657.4 meters

Upvc, DN 300 mm length 6,836.3 meters

Upvc, DN 150mm length 8,141.8 meters

Upvc, DN 110 mm length 16,692.9 meters

Steel pipe, DN 600-450 mm length 49,000 meters

Upvc, DN 350-110 mm length 16,371.2 meters.

Northern water scheme Distribution and transmission mains Galvanized iron, DN 110 mm length 680.3 meters

Upvc, DN 110 mm length 9,856.3 meters

Upvc, DN 150 mm length 3,383.6 meters

Upvc, DN 32 mm length 4,143.4 meters

Upvc, DN 50 mm length 3,023.4 meters

Upvc, DN 63 mm length 17,477.3 meters

Upvc, DN 90mm length 9,471.3 meters

Southern water supply scheme Distribution and transmission mains Galvanized iron, DN 110 mm length 528.7 meters

Galvanized iron, DN 150 mm length 2733.8 meters

Galvanized iron, DN 300 mm length 9,696.1 meters

Galvanized iron, DN 32 mm length 935.2 meters

Galvanized iron, DN 50mm length 4,876.1 meters

Galvanized iron, DN 90 mm length 7,269.1 meters

HDPE, DN 32 mm length 11,641.9 meters

HDPE, DN 63 mm length 5,315.2 meters

HDPE, DN 90 mm length 4,714.6 meters

Upvc, DN 32 mm length 1,163.3 meters

Upvc, DN 50 mm length 1,231.2 meters

Upvc, DN 600 mm length 851.2 meters

Upvc, DN 63 mm length 1,643.8 meters

Upvc, DN 90 mm length 995.3 meters

Western water supply scheme Distribution and transmission mains Galvanized iron, DN 110 mm length 41,581.2 meters

Galvanized iron, DN 150 mm length 34,070.1 meters

Galvanized iron, DN 200 mm length 19,063.4 meters

Galvanized iron, DN 300 mm length 35,405 meters

Galvanized iron, DN 32 mm length 1,166 meters

Galvanized iron, DN 50mm length 1,314.6 meters

Galvanized iron, DN 600 mmm length 1,215.8 meters

Galvanized iron, DN 63 mm length 388.2 meters

Galvanized iron, DN 90 mm length 580 meters

PPR, DN 32 mm length 490.3 meters

Upvc, DN 90 mm length 1,339.2 meters

Upvc, DN 32 mm length 13,604.9 meters

Upvc, DN 450 mm length 3,801.1 meters

Upvc, DN 50 mm length 33,500.9 meters

Upvc, DN 63 mm length 20,787 meters

Upvc, DN 90 mm length 14,479.1 meters

Central water supply scheme Distribution and transmission mains Galvanized iron, DN 110 mm length 4,694.8 meters

Galvanized iron, DN 150 meters, length 3,082.3 meters

Galvanized iron, DN 200 mm length 861.1 meters

Galvanized iron, DN  250 mm length 1,642 meters

Galvanized iron, DN 32 mm length 4,043.5 meters

Galvanized iron, DN 150 mmm length 22,522.8 meters

HDPE, DN 32 mm length 3,735.8 meters

Upvc, DN 110 mm length 3,482.3 meters

Upvc, DN 150 mm length 1,925.4 meters

Upvc, DN 200 mmm length 2,255.9 meters

Upvc, DN 250 mm length 1,760.5 meters

Upvc, DN 32 mm length 55, 191.1 meters

Upvc, DN 50 mm length 32,462 meters

Upvc, DN 63 mm length 22,535.2 meters

Upvc, DN 90 mm length 13,924.2 meters

Visits: 309